√在线天堂中文最新版网,97se亚洲综合色区,国产成人av免费网址,国产成人av在线影院无毒,成人做爰100部片

當(dāng)前位置: 在線翻譯 > 英語翻譯 > loading stage
ONOFF
劃詞翻譯
導(dǎo)航
建議反饋
詞典App

loading stage中文是什么意思

  • 裝卸臺
  • 裝卸棧橋

"查查詞典"手機(jī)版

千萬人都在用的超大詞匯詞典翻譯APP

  • 例句與用法
  • Method is called at the end of the page load stage
    方法在頁加載階段結(jié)束時調(diào)用。
  • Initialization stage and before the load stage
    初始化階段結(jié)束但加載階段尚未開始時發(fā)生。
  • Event at the end of the page load stage
    在頁加載階段結(jié)束時引發(fā)
  • Occurs at the end of the load stage of the page s life cycle
    在頁生命周期的加載階段結(jié)束時發(fā)生。從
  • Validation information is not available during a page s initialization or load stage
    驗證信息在頁的初始化或加載階段不可用。
  • The original load stages between 2 and 50 kn have now been extended up to 500 kn
    原有的2至50kn的負(fù)載級別目前已經(jīng)擴(kuò)大到了最大500kn 。
  • According to the loading characteristics of bonded post - tensioned prestressed concrete frames , a program is worked out to perform a nonlinear finite element analysis for the static staff in both the stretching wire stage and the loading stage
    摘要根據(jù)后張有粘結(jié)預(yù)應(yīng)力混凝土框架結(jié)構(gòu)的受力特點,編制了適用于預(yù)應(yīng)力建立和施加外荷載兩個階段的靜力桿件非線性有限元分析程序。
  • In the paper , nonlinear finite element method ( fem ) analysis of multi - planar joints of steel tubular members has been realized by ansys software . it traces the whole process of stress - strain of total loading stages , and the ultimate bearing capacity of the joints is gained
    本文利用ansys有限元程序?qū)崿F(xiàn)了對鋼管相貫節(jié)點的彈塑性非線性分析,跟蹤結(jié)構(gòu)在整個加載階段各點的應(yīng)力、應(yīng)變變化過程,求出了節(jié)點的極限承載力。
  • This thesis mainly researches second - prestressing precast slabs , it is important to study its one - way slab floor ' s ability in use . specific content include : imitate construction load lab , through this method to analyze the precast slabs " properties in the first stage in burden load . one - way precast slabs " lab , analyes one - way precast slabs sandwich s ability in second burden load stage
    具體的研究內(nèi)容有:模擬施工荷載試驗,即對裝配整式夾層板第一受力階段進(jìn)行研究;單向裝配整體式結(jié)構(gòu)的第二受力階段的性能進(jìn)行研究,并分析了二次張拉預(yù)應(yīng)力筋所引起的結(jié)構(gòu)的變形和應(yīng)變與計算結(jié)果進(jìn)行對比。
  • That is the identification of material parameter is done through the true deformation increment in the loading stage before , loading increment , and the stress state by artificial neural networks , after this , we can get loading increment for the next deformation stage by the artificial neural networks trained by stress stage , target deformation increment and the identified m value
    即首先根據(jù)上一步加載材料的實際應(yīng)變增量、所加應(yīng)力增量以及材料所在的應(yīng)力狀態(tài)識別出材料物性參數(shù)m值,然后再根據(jù)材料加載后的應(yīng)力狀態(tài)、目標(biāo)應(yīng)變增量以及識別所得m值,由訓(xùn)練好的識別應(yīng)力增量的人工神經(jīng)網(wǎng)絡(luò)產(chǎn)生應(yīng)加的載荷增量。
  • 更多例句:  1  2
  • 推薦英語閱讀
loading stage的中文翻譯,loading stage是什么意思,怎么用漢語翻譯loading stage,loading stage的中文意思,loading stage的中文loading stage in Chinese,loading stage的中文loading stage怎么讀,發(fā)音,例句,用法和解釋由查查在線詞典提供,版權(quán)所有違者必究。

說出您的建議或使用心得